Fast-Deploy Power Solutions for Mining & Metallurgical Sites

Containerized E-House substations designed for harsh mining environments,
reducing on-site installation time, labor cost, and power system risks.

Why Mining Projects Move to E-House Solutions

Traditional Substation

  • On-site civil construction
  • Long installation period
  • High labor & coordination cost
  • High environmental risk

Metalore E-House Solution

  • Factory prefabrication
  • Plug & play, fast deployment
  • Minimal on-site work
  • Designed for harsh conditions
Top view of modern industrial machinery working with black natural coal in daylight

Power stability in the harshest mining environments

Mining sites face extreme challenges — dust storms, temperature fluctuations, vibration, and high humidity — where conventional substations struggle to survive.

A large cargo ship docked at Gothenburg port with industrial cranes, Sweden.

From Factory to Site — Faster Deployment, Lower Risk

Traditional substations require extensive on-site civil works, multiple vendors, and long commissioning cycles — often causing delays and unexpected costs.

Close-up of a vintage industrial control panel with multiple buttons and switches.

One Integrated Power System — One Responsible Partner

In mining projects, power systems often involve multiple subsystems from different suppliers, increasing integration complexity and commissioning risks.

Why Metalore

Selected Projects

Engineering & Technical Service Team

Supporting your project from design to commissioning

Get Your Custom E-House Solution Today

    Upload Your File

    Scroll to Top