Fast-Deploy Power Solutions for Mining & Metallurgical Sites
Containerized E-House substations designed for harsh mining environments,
reducing on-site installation time, labor cost, and power system risks.
Why Mining Projects Move to E-House Solutions
Traditional Substation
- On-site civil construction
- Long installation period
- High labor & coordination cost
- High environmental risk
Metalore E-House Solution
- Factory prefabrication
- Plug & play, fast deployment
- Minimal on-site work
- Designed for harsh conditions

Power stability in the harshest mining environments
Mining sites face extreme challenges — dust storms, temperature fluctuations, vibration, and high humidity — where conventional substations struggle to survive.

From Factory to Site — Faster Deployment, Lower Risk
Traditional substations require extensive on-site civil works, multiple vendors, and long commissioning cycles — often causing delays and unexpected costs.

One Integrated Power System — One Responsible Partner
In mining projects, power systems often involve multiple subsystems from different suppliers, increasing integration complexity and commissioning risks.
Why Metalore
- Experience serving mining & metallurgical power systems
- Familiar with crusher, conveyor, grinding and smelting power requirements
- Engineering-based approach, not just equipment supply
- OEM-compatible components and international standards
Selected Projects





Engineering & Technical Service Team
Supporting your project from design to commissioning